Vehículo

2026 Jeep® Wrangler Sport

Millas: 9 • VIN: 1C4PJXDN7TW201129 • Número de inventario: TW201129

  • Cooper Price
    $36,196

  • MSRP
    $45,255
  • Cooper Savings
    -$6,094
  • 2026 National Bonus Cash
    -$500
  • 2026 Southwest BC Bonus Cash
    -$750
  • 2026 National Retail Bonus Cash
    -$2,500
  • Document Fee
    +$785

  • Conditional Offers:
  • Trade Assistance
    -$2,000
  • Finance Assistance
    -$1,000
  • Conditional Price
    $33,196

Especificación del vehículo

Tipo de vehículoSUV
CondiciónNew
Millaje9
Motor2.0L I4 DOHC
Transmisión8-Speed Automatic
Tren de conducción4WD
Tipo de combustibleGasoline
MPG en ciudad20
MPG en carretera22
Color exteriorBlack Clearcoat
Color interiorBlack
Puertas4

Características

  • Entrada sin Llave
  • Cámara de Retroceso
  • Apple CarPlay
  • Android Auto

Horas

  • Domingo:Cerrado
  • Lunes:8:30am - 8:00pm
  • Martes:8:30am - 8:00pm
  • Miércoles:8:30am - 8:00pm
  • Jueves:8:30am - 8:00pm
  • Viernes:8:30am - 8:00pm
  • Sábado:8:30am - 8:00pm

Dirección e información de contacto

12800 NW 10th St, Yukon, OK 73099

(405) 578-7736

Etiqueta de la ventana

Our Price

$36,196
1/22

2026 Jeep® Wrangler

Sport

  • Cooper Price
    $36,196

  • MSRP
    $45,255
  • Cooper Savings
    -$6,094
  • 2026 National Bonus Cash
    -$500
  • 2026 Southwest BC Bonus Cash
    -$750
  • 2026 National Retail Bonus Cash
    -$2,500
  • Document Fee
    +$785

  • Conditional Offers:
  • Trade Assistance
    -$2,000
  • Finance Assistance
    -$1,000
  • Conditional Price
    $33,196

$607

por mes

4.5

% ABR

$3,619

Inicial

60

Meses

Obtén la precalificación en segundos.

Información básica

N.° de stock

VIN

Ubicación del vehículo

Joe Cooper Chrysler Jeep Dodge Ram of Yukon

12800 NW 10th St, Yukon, OK 73099

Ver todos los vehículos en esta ubicación

Características

Estima tu pago

Obtén una estimación rápida de pago basada en los términos básicos del préstamo.

¿Cuánto vale tu vehículo?

Obtenga una estimación del valor de su vehículo, basada en datos reales del mercado local, en menos de 30 segundos.

Proporcionado por

logotipo de Motive

Descripción

2026 Jeep Wrangler Sport in Black Clearcoat

Experience the iconic and rugged appeal of the 2026 Jeep Wrangler Sport, a vehicle crafted for adventure and designed to stand out in both urban and off-road environments. Finished in a sleek Black Clearcoat, this SUV epitomizes the robust capability and timeless style that Jeep enthusiasts have come to love.

Key Features:

  • Engine & Performance:

  • Under the hood, you'll find a powerful 2.0L I4 DOHC engine paired with a refined 8-Speed Automatic transmission. It offers impressive torque that ensures excellent off-road capabilities, making it ideal for both thrilling off-road escapades and smooth highway cruising.

  • With its 4WD drivetrain, the Wrangler Sport is built to tackle diverse terrains with confidence, providing outstanding traction and stability across varying conditions.

  • Design & Comfort:

  • The exterior's Black Clearcoat finish complements the classic Jeep design, giving it a bold and sophisticated look.

  • Inside, the Black interior offers a mix of rugged simplicity and user-friendly technology. The 4-door configuration ensures easy access and plenty of room for passengers and gear, enhancing both comfort and practicality for your adventures.

  • Technology & Convenience:

  • Equipped with the latest in automotive technology, including an intuitive infotainment system, the Wrangler ensures that you're connected and entertained wherever your journey takes you.

  • Thoughtful features like the easy-to-navigate controls and ample storage compartments provide convenience and ease of use, enhancing your driving experience.

  • Economy:

  • This SUV offers a respectable fuel economy of 20 miles per gallon in the city and 22 miles per gallon on the highway, making it a versatile choice for both daily commutes and long road trips.

Why Choose This Jeep Wrangler Sport?

The 2026 Jeep Wrangler Sport encapsulates the spirit of freedom and adventure. Whether you're exploring rugged trails or navigating city streets, this SUV offers the durability, style, and versatility that Jeep is renowned for. With its exceptional capability and modern amenities, it's the perfect companion for those who seek adventure with comfort and confidence.

"Who loves ya', Oklahoma?" At Joe Cooper Chrysler Jeep Dodge Ram of Yukon, we're dedicated to providing vehicles that our community treasures, and the Jeep Wrangler Sport is no exception. Come visit us and start your next adventure today!

Solicita una Pre-Calificación de crédito en segundos

Obtenga la precalificación en minutos, sin que le afecte su puntaje de crédito.

Proporcionado por

logotipo de Motive

Información Del Concesionario

Domingo

Cerrado

Lunes

8:30am - 8:00pm

Martes

8:30am - 8:00pm

Miércoles

8:30am - 8:00pm

Jueves

8:30am - 8:00pm

Viernes

8:30am - 8:00pm

Sábado

8:30am - 8:00pm

2026 Jeep® Wrangler

Sport

  • Cooper Price
    $36,196

  • MSRP
    $45,255
  • Cooper Savings
    -$6,094
  • 2026 National Bonus Cash
    -$500
  • 2026 Southwest BC Bonus Cash
    -$750
  • 2026 National Retail Bonus Cash
    -$2,500
  • Document Fee
    +$785

  • Conditional Offers:
  • Trade Assistance
    -$2,000
  • Finance Assistance
    -$1,000
  • Conditional Price
    $33,196

$607

por mes

4.5

% ABR

$3,619

Inicial

60

Meses

Obtén la precalificación en segundos.