2026 BMW® X2 xDrive28i Sports Activity Coupe
Millas: 10 • VIN: WBX63GM0XT5526991 • Número de inventario: T5526991
Especificación del vehículo
Características
Horas
Dirección e información de contacto
14145 N Broadway Ext, Edmond, OK 73013
(405) 755-3600
MSRP
xDrive28i Sports Activity Coupe
$836
por mes
4.5
% ABR
$4,986
Inicial
60
Meses
Obtén una estimación rápida de pago basada en los términos básicos del préstamo.
Introducing the 2026 BMW X2 xDrive28i Sports Activity Coupe, a striking blend of luxury, performance, and cutting-edge technology, ready to redefine your driving experience. Finished in a sleek Jet Black exterior and complemented by a plush Black interior, this SUV epitomizes sophistication and elegance.
Power and Efficiency:
Under the hood, the BMW X2 is equipped with an Intercooled Turbo Premium Unleaded I-4 2.0 L/122 engine, paired with a 7-speed dual-clutch transmission. This impressive combination delivers both power and fuel efficiency, achieving an estimated 24 MPG in the city and 34 MPG on the highway. The all-wheel-drive system ensures optimal traction and stability, making it ideal for various driving conditions.
Luxurious Features:
Step inside and experience the comfort of Black Perforated Veganza upholstery, which offers a premium feel with easy maintenance. The heated front seats, along with the heated steering wheel, ensure comfort during colder months. The Sky Lounge Panoramic Roof provides an open-air experience, while the ambient lighting enhances the vehicle's aesthetic appeal, creating a calming atmosphere.
Innovative Technology:
The X2 is equipped with the advanced Technology Package, featuring a drive recorder, Remote Engine Start, and Live Cockpit Pro that includes a Head-Up Display and video augmented reality navigation. The system integrates real-time navigation directions and live video from the Surround View cameras on the central display, offering a seamless and intuitive user experience.
Enhanced Safety and Convenience:
Safety is paramount in the X2, with features such as Blind Spot Monitor, Cross-Traffic Alert, Lane Keeping Assist, and Front Collision Mitigation. The Rear Parking Aid and Back-Up Camera provide added convenience during parking maneuvers. The Power Liftgate and Hands-Free Liftgate add to the ease of access, making loading and unloading hassle-free.
Entertainment and Connectivity:
Stay connected with the Harman/Kardon Premium Sound System that delivers crisp and clear audio. The vehicle features MP3 capability, HD Radio, Satellite Radio, and Bluetooth Connection, ensuring entertainment at your fingertips.
A Statement of Style:
The exterior is further enhanced with 19-inch Y-Spoke Bi-Color wheels that lend a sporty flair to this versatile SUV. The sleek design is accentuated by LED Headlights with Automatic Highbeams and a distinctive rear spoiler.
Experience the perfect fusion of luxury, technology, and performance with the 2026 BMW X2 xDrive28i. It's not just a car; it's a lifestyle. "Who loves ya', Oklahoma?" Jackie Cooper BMW invites you to discover what makes the BMW X2 the ultimate driving machine. Visit us today and see how we make the ownership experience as exceptional as the vehicle itself.
Domingo
Cerrado
Lunes
8:30am - 8:00pm
Martes
8:30am - 8:00pm
Miércoles
8:30am - 8:00pm
Jueves
8:30am - 8:00pm
Viernes
8:30am - 8:00pm
Sábado
9:00am - 7:00pm
xDrive28i Sports Activity Coupe
$836
por mes
4.5
% ABR
$4,986
Inicial
60
Meses